ID: 53168403
Closed
Bidding has ended on this item.
A LONG LEADER STRIP OF 3 - 10c PREXIE COIL (847) MNH
$5.00
Seller:
v1858669 (209)
Current Bid: $5.00
Bids: 0
A LONG LEADER STRIP OF 3 - 10c PREXIE COIL (847) MNH Larger rolls of coils had an unprinted leader strip so they could be fed into stamp affixing machines without ruining the front of the rolls. Very scarce. The stamps along catalog for $33
Item Specifics
- Condition
- Mint (NH)
- Stamp Format
- Multiple
Item Description
A LONG LEADER STRIP OF 3 - 10c PREXIE COIL (847) MNHLarger rolls of coils had an unprinted leader strip so they could be fed into stamp affixing machines without ruining the front of the rolls.
Very scarce. The stamps along catalog for $33
Seller Information
- Seller
- v1858669 (209)
- Registered Since
- 02/10/2007
- Feedback
- 100%
- Store
- Mary Vee's Stamps
Bids History
The listing has no bids.
Sales History
The listing has not been sold.
- Item Location
- Texas, United States
- Ships To
- Worldwide
Postage Calculator
- Select Country
- Quantity
- Returns Accepted
- Yes
Public Questions
There are no messages posted.
You need to be logged in to ask the seller a question.
Click here to login
Click here to login
Listing viewed 4 times
Listing watched by 0 users